

Lastly, a new overpass would be constructed at Mustang Vista, where Mustang Vista would be extended on the west side of US 281 to tie into Short Hill and Casey Road. The SH 46 overpass would be replaced with a wider bridge to accommodate auxiliary lanes and future expansion. The FM 1863/Bulverde Road overpass would be improved by adding frontage roads and approach/departing lanes. It is a 1. The project would also consist of construction of entrance and exit ramps and auxiliary lanes, including left/right turn lanes and turnaround lanes. 26018 Kalksteine Loop New Braunfels TX 78132 was recently sold. Read what they think about their salaries on our Compensation FAQ page for Comal Appraisal District. In addition, six-foot sidewalks would be constructed on both sides of the roadway. Comal Appraisal District employees attributed a compensation and benefits rating of 2.2/5 stars to their company.


as identified and valued by the Hays Central Appraisal District (CAD). Two to three frontage road lanes would be constructed in each direction and would be separated from the main lanes by a buffer space. Comal County Tax Office: Bexar County Tax Office: Guadalupe County Tax Office. The proposed US 281 would consist of two main lanes with inside and outside shoulders in each direction, separated by a varied-width median. Comal Video Visitation Center (2 blocks south from the Main Jail).
Comal cad software#
The proposed project would expand US 281 within the project limits from a four-lane divided highway to a four-lane freeway with frontage roads in each direction, for a distance of approximately 6.3 miles. The main agenda item is the CAD Software update.
